Construction of concrete (3 cr)
Code: 5101075-3005
General information
- Enrollment
-
08.12.2023 - 20.01.2024
Registration for the implementation has ended.
- Timing
-
07.01.2024 - 30.04.2024
Implementation has ended.
- Number of ECTS credits allocated
- 3 cr
- Local portion
- 3 cr
- Mode of delivery
- Contact learning
- Unit
- Engineering and Business
- Teaching languages
- Finnish
- Seats
- 15 - 60
- Degree programmes
- Degree Programme in Construction and Municipal Engineering, BCM
Realization has 5 reservations. Total duration of reservations is 10 h 0 min.
Time | Topic | Location |
---|---|---|
Tue 09.04.2024 time 14:00 - 16:00 (2 h 0 min) |
Betonirakentaminen 5101075-3005 |
ICT_C1039_Sigma
SIGMA
|
Thu 11.04.2024 time 09:00 - 11:00 (2 h 0 min) |
Betonirakentaminen 5101075-3005 |
EDU_2001
Elias muunto byod
|
Mon 15.04.2024 time 14:00 - 16:00 (2 h 0 min) |
Betonirakentaminen 5101075-3005 |
ICT_C1039_Sigma
SIGMA
|
Mon 22.04.2024 time 14:00 - 16:00 (2 h 0 min) |
Betonirakentaminen 5101075-3005 |
ICT_C1039_Sigma
SIGMA
|
Tue 21.05.2024 time 15:00 - 17:00 (2 h 0 min) |
Betonirakentaminen 5101075-3005 |
EDU_3001
Kaarle muunto byod
|
Changes to reservations may be possible.
Evaluation scale
H-5
Objective
After completing the course, the student knows the most important concrete work methods.He knows the significance of a casting plan and is able to draw one up.He knows how casting is performed and how quality control is performed and why.
The student is able to take into account e.g.effects of temperature and other conditions.The student is able to calculate the strength of the concrete structure of the heat-degree-days.
Content
Different kind of casting methods and how quality control is done in concrete wotrk.